No, this is not possible.
The original Markstrat version had 10 periods. This number was increased to 12 in Markstrat3 because some professors wanted to do 2 “trial” periods before the beginning of the 10 “real” runs.
In Markstrat.6, we offer the ability to run 2 “trial” periods and then reset everything to 0 with the “Cancel all runs” action of the Decision Round Dashboard. Then, the 10 “real” runs can be done.
Comments
0 comments
Article is closed for comments.